Installation

HCTC’s field engineering teams have extensive experience erecting and commissioning cooling towers of all types across industrial facilities, district cooling plants and commercial developments throughout the UAE and GCC.

 

INSTALLATION INCLUDES:

Site survey | Structural erection | Pipework commissioning | Electrical connections | Thermal performance testing | Full documentation package (as-built drawings + O&M manuals)

SAFETY:

Every installation conducted under a site-specific HSE plan aligned with ISO 45001.


Dubai

Headquarters

Jumeirah lake towers 1004, Tiffany tower,
+971 4 451 5211

PO BOX 125787

info@hctc.ae

GET IN TOUCH

Follow Our Activity